How to brief a wiring harness designer — a 1-page checklist
What to send on day one to get a costed plan back in two working days. Field tested.
Field-tested thinking on harness design, EDS workflows, 3D CAD, HV harness shielding and the economics of running a design-only consultancy. Plain English, written by the engineers actually doing the work.
Six launch articles are in draft. We publish when they are useful, not on a schedule. As they go live they will appear in the grid below in place of these placeholders.
Six pieces, one per service or sector — each anchored on a real question we get asked on first calls.
What to send on day one to get a costed plan back in two working days. Field tested.
The honest decision tree, with the costs and the timing called out alongside.
Procurement-side language. What a Tier-1 actually needs from a design consultancy.
ECE R100, ISO 6469, IEC 60664, ISO 17409 and what they mean for routing decisions.
The three things race-team chief mechanics care about, in the order they care about them.
A 5-axis honest comparison. Outsourcing wins on speed, in-house wins on continuity, and there is a middle ground that is sometimes better than either.
If there is something you want our view on, send it in. The best questions often become the next post.